Preparation laying the tile and grouting it to keep it all together.
Installing travertine tile on concrete.
Travertine paver and travertine tile mud set installation.
Also check out my other videos.
To install travertine tile start by removing any previous covering measuring the are you want to tile and prepare the surface for tiling.
Travertine can be installed for countertops flooring and walls.
The installation steps include.
The chalk lines should cross at the midpoint of the floor at right angles.
The tiles can be placed in any pattern and secured in place using a mallet image 2.
When you spread the mortar onto the concrete hold the trowel on a 45 degree angle and only spread enough mortar for 2 to 4 travertine pavers.
Once the mortar is mixed it is time to spread it on the concrete.
Make sure to like share and subscribe.
Next mark the midpoint of the area you ll be tiling to ensure that you start at the focal point of the room.
To spread the mortar onto the concrete you will use a trowel.
Lay the tiles the tiles for this project are travertine a morphed limestone that can be used either indoors or outdoors.
The most common tools used to install travertine tile or most tile for that matter include a tape measure a rubber mallet a power drill and mixing paddle a marker or wax pencil a level a tapping block a torpedo level a chalk line tile spacers a margin trowel a notched trowel and a wet saw.
It s twice as strong as concrete but can be cut using a wet table masonry saw image 1.
Whether it is on top of dirt or concrete it can be a fairly simple task to create a foundation and prepare the area for installation.
Going down on concrete used gawker on macbook pro to capture timelapse music in order.
Installing travertine floor tiles 1 mark the midpoint of each wall and connect opposite walls with a chalk line.
To prepare a dirt or ground area you will need to lay down a base of rock or gravel and then a layer of sand on top.
Placing the full travertine pavers.
Before beginning the installation process it is advised to remove the pavers or tiles from the crates and begin to arrange them in place.
Installation is considered a medium to high difficulty job and will require a wet saw is required to cut the tiles to the appropriate size.
Just like other types of tiles and natural stone travertine pavers and travertine tiles can be laid mud set on top of an existing concrete surface.